Infrastructure
Drinking Water Alimentation Network 12.4 km length
Natural Gases Distribution Network 8,2 km approx. length (unfinished)
Electrical Power Distribution Network 28,775 km length. The locality is supplied with electrical power from the national energy grid system through the old electrical networks of 6 kV and the new aerial networks ones of 20 kV or 110 kV.
Thermal Energy Distribution Network
Currently, the thermal energy for the blocks situated in the upper zone of Aninoasa's Valley is supplied by 3 thermal centers: CT1, CT2, CT3. These generators are fueled by solid combustibles and each services 12 blocks of apartments. The apartment blocks from Iscroni are supplied with thermal energy from a thermal point positioned in the block's neighborhood (10 blocks).
The Residual Water Draining Network
4 km length. Based on a series of pipes that lead from a collection point in the old town and combined with water flowing from the collector on the West Jiu River and from a collector network for the city's new central collection point.
The surface of the administrative territory
361 ha
Arable (plowable) Land 115 ha
Pasture-Grazing Land 136 ha
Hay-field 1,633 ha
Forest 1,216 ha
Waters 22 ha
Road 55 ha
Railways 2.4 ha
Inner-city area 305.75 ha
Central area with public-interest functions 7 ha
Area with flats and other complementary functions 65.3 ha
Area with industrial units 36.8 ha
Area with parks, sport fields and places for recreation 3.5 ha
Area of communal husbandry and grave-yards 8 ha
Fields of special destinations and territorial equipment; including:
· Roads network 55
ha
· Railways network
4.8 ha
Source: DEEP |